Skip to the content

NHM · Guideline

Mission for Integrated Development of Horticulture (MIDH) — Operational Guidelines, April 2025

Issued by Horticulture Division, Department of Agriculture & Farmers Welfare, Ministry of Agriculture & Farmers Welfare, Government of India.

  • Current
Official original

Summary

Our editorial summary. It is not the document and does not replace it.

The operational guidelines for the Mission for Integrated Development of Horticulture, issued by the Horticulture Division of the Department of Agriculture & Farmers Welfare in April 2025. They set out the mission structure from national to district level, the fund-flow pattern, every supported intervention, and — in Annexure V — the cost norms and pattern of assistance for the NHM and HMNEH sub-schemes.

For a farmer, Annexure V is the operative part: it lists, component by component, the upper limit of cost recognised for subsidy calculation (the “cost norm”), the percentage of assistance, and the maximum eligible area, capacity or number of units. The guidelines state plainly that a cost norm is an upper limit for calculating subsidy, not a market price.

Several components defer to other schemes rather than fixing their own value — SMAM for most farm machinery, PDMC for drip irrigation, PKVY for organic farming, and NCCD standards for post-harvest infrastructure. Where the guidelines defer, no separate NHM figure exists.

Applicability

Who and what this document covers.

National operational guidelines for MIDH. NHM is the sub-scheme covering all States and Union Territories except the North Eastern and Himalayan region, so Uttar Pradesh falls under NHM. Cost norms and the pattern of assistance are set out in Annexure V. This document states the national framework; it does not by itself establish that a State application window is open, that budget is available, or that any individual qualifies.

Versions we have checked

A version is a copy at a moment in time. The nightly monitor watches the current one and opens a review when it changes.

April 2025 edition, as published on nhb.gov.in Current
Retrieved 07 Sep 2026 · effective from 01 Apr 2025
First version registered on this platform. 100 pages. Text extraction is good for narrative sections; Annexure V is laid out as wide tables, so figures taken from it must be confirmed against the original page.
Official link for this version

Explanations built on this document

Guides whose statements cite it, so you can see what it is being used to say.

Source verified by our team
Source verified by our team
Source verified by our team
Source verified by our team
Report an issue with this document record

A newer version, a wrong date, a broken link — tell us and we will check it.