Cold storage and post-harvest under NHM: why the rate is 35% and where 5,000 MT comes from

Most large post-harvest and cold-chain projects are assisted at 35% in general areas as credit-linked back-ended assistance. Cold storage up to 5,000 MT is promoted under NHM; larger capacity moves to the NHB sub-scheme, and subsidy under NHM stops at 5,000 MT.

  • Source verified by our team
  • 2 min read
Illustrative image
Ask about this
Source verified by our team
Author Editorial team Reviewer Admin Verified 07 Sep 2026 Applies to NHM · Cold storage Rule period 01 Apr 2025 – current
A reviewer matched the statements on this page to the official documents listed under Sources. It describes our verification work, not an official endorsement. Scheme decisions and approvals rest with the relevant authorities.

Before you spend money: cost norms, rates and conditions can be changed by the Government. This page explains the April 2025 MIDH operational guidelines as written. Confirm the current position with your State Horticulture Department before committing to a project.

Post-harvest components behave differently from field components. They are entrepreneur-driven, generally financed through a bank, and the money arrives at the end.

The 5,000 MT line

Cold storages for long-term storage up to 5,000 MT capacity are promoted under the NHM and HMNEH sub-schemes. Capacity above 5,000 MT and up to 20,000 MT is promoted under the NHB sub-scheme instead. A project may be built larger, but subsidy under NHM is restricted to 5,000 MT.

This is why the same cold storage project can be described as “NHB” by one consultant and “NHM” by another. The capacity decides which door you are at.

Construction type changes the norm

For cold storage, civil construction carries ₹9,600 per MT, while civil construction with a pre-engineered building carries ₹12,000 per MT. The choice of construction method therefore changes the recognised cost, not just the build time.

The 35% pattern

Integrated pack houses, collection and aggregation centres, pre-cooling units, staging cold rooms, ripening chambers and the main cold storage types are assisted at 35% in general areas, as credit-linked back-ended assistance.

Two components sit outside that pattern: a farm gate pack house and low-cost onion or garlic storage are assisted at 50%, with credit linkage applying to onion storage above a stated project cost.

What credit-linked back-ended means in practice

  • You need a sanctioned loan from a bank or financial institution before the subsidy has a route.
  • The assistance is settled after completion and verification, usually against the loan account.
  • Your own funds and the loan carry the whole project through construction.

Anyone offering to arrange “subsidy first” on a cold storage project is describing something the guidelines do not provide for.

Standards

Post-harvest infrastructure is expected to follow the relevant NCCD standards. Specification shortcuts at the build stage are a common reason for a claim failing at inspection.

Sources

Mission for Integrated Development of Horticulture (MIDH) — Operational Guidelines, April 2025
Horticulture Division, Department of Agriculture & Farmers Welfare, Ministry of Agriculture & Farmers Welfare, Government of India · Guideline · 01 Apr 2025 · Current
Official original
Statements checked on this page (7)
  • Source verified by our team Cold storages for long-term storage up to 5,000 MT capacity are promoted under the NHM and HMNEH sub-schemes. Capacity above 5,000 MT and up to 20,000 MT is promoted under the NHB sub-scheme. Where a project exceeds 5,000 MT, subsidy under NHM is restricted to 5,000 MT. — Printed p. 16 (PDF page 26), Annexure V and related sections
  • Source verified by our team For cold storage of the civil construction type, the cost norm is ₹9,600 per MT; for civil construction with a pre-engineered building it is ₹12,000 per MT. — Printed p. 52 (PDF page 62), Annexure V and related sections
  • Source verified by our team An integrated pack house is supported against a maximum project cost per beneficiary stated in the guidelines, with credit-linked back-ended assistance at 35% in general areas. — Printed p. 50 (PDF page 60), Annexure V and related sections
  • Source verified by our team A collection and aggregation centre is supported against a maximum project cost per beneficiary stated in the guidelines, with credit-linked back-ended assistance at 35% in general areas. — Printed p. 51 (PDF page 61), Annexure V and related sections
  • Source verified by our team A staging cold room is supported against the maximum cost stated in the guidelines, with back-ended assistance at 35% in general areas. — Printed p. 51 (PDF page 61), Annexure V and related sections
  • Source verified by our team For low-cost onion and garlic storage, the cost norm varies by capacity band, with assistance at 50%. Credit linkage applies where the project cost exceeds the threshold stated in the guidelines. — Printed p. 58 (PDF page 68), Annexure V and related sections
  • Source verified by our team Post-harvest and cold-chain projects such as cold storage, pack houses and refrigerated transport are entrepreneur-driven and generally use the credit-linked back-ended assistance system rather than direct payment. — Printed p. 17 (PDF page 27), Annexure V and related sections
Version history (3)
DateChangeReasonStatus
14 Oct 2026 Updated — Source verified by our team
07 Sep 2026 Bulk approved by the owner (7 Sep 2026), not a line-by-line review — Source verified by our team
07 Sep 2026 Created — Awaiting verification
Report an issue

Spotted something outdated or wrong? Tell us what and, if possible, where the correct information is. No account or phone number needed.

Frequently Asked Questions

Capacity decides. Cold storage up to 5,000 MT is promoted under the NHM and HMNEH sub-schemes; capacity above 5,000 MT and up to 20,000 MT is promoted under NHB. A project may be built larger, but subsidy under NHM is restricted to 5,000 MT.

You need a sanctioned loan from a bank or financial institution before the subsidy has a route, and the assistance is settled after completion and verification, usually against the loan account. Your own funds and the loan carry the project through construction.

Civil construction carries ₹9,600 per MT, and civil construction with a pre-engineered building ₹12,000 per MT. The choice of construction method changes the recognised cost, not just the build time.

A farm gate pack house and low-cost onion or garlic storage are assisted at 50%, with credit linkage applying to onion storage above a stated project cost. The main pack houses, pre-cooling units, staging cold rooms and ripening chambers are at 35%.