NHB · Cold storage above 5,000 MT

NHB cold storage: capacity bands, rates and the 35% pattern

NHB takes cold storage projects above 5,000 MT and up to 20,000 MT. Rates fall as capacity rises, from ₹9,120 per MT in civil construction at the smallest band to ₹4,080 per MT at the largest. Assistance is 35% in general areas, credit-linked back-ended, and NCCD guidelines apply.

  • Source verified by our team
  • 4 min read
Illustrative image
Ask about this
Source verified by our team
Author Editorial team Reviewer Admin Verified 07 Sep 2026 Applies to NHB · Cold storage above 5,000 MT Rule period 01 Apr 2025 – current
A reviewer matched the statements on this page to the official documents listed under Sources. It describes our verification work, not an official endorsement. Scheme decisions and approvals rest with the relevant authorities.

Changed on 21 August 2026. The National Horticulture Board revised its rate of assistance to 35% in general areas and 45% in the North Eastern and Himalayan States, Scheduled Areas and specified Union Territories. Cold storage subsidy is now capped at ₹2.00 crore per project, the cost of land no longer counts as eligible project cost, and only one member of a family may ever claim. Fresh applications have also been paused since 4 September 2026. What changed, in full.

Read this first: the NHB figures on this page come from Annexure VI of the MIDH Operational Guidelines, April 2025, which is headed “National Horticulture Board: proposed changes in components and cost norms”. They are recorded here as written. Confirm the operative position with the National Horticulture Board before spending money.

Cold storage is where the split between the two schemes is sharpest, and where most confusion happens.

The capacity line

NHM promotes cold storage up to 5,000 MT. NHB takes projects with capacity above 5,000 MT and up to 20,000 MT. Same country, same document, different annexure, entirely different numbers.

Type-I in civil construction

Capacity Rate
5,001 to 6,500 MT ₹9,120 per MT
6,501 to 8,000 MT ₹8,640 per MT
8,001 to 10,000 MT ₹8,160 per MT
10,001 to 20,000 MT ₹4,080 per MT

Note how sharply the rate drops in the largest band. A 12,000 MT store is not costed at twice the rate of a 6,000 MT one.

Type-I in civil plus pre-engineered building

Capacity Rate
5,001 to 6,500 MT ₹11,400 per MT
6,501 to 8,000 MT ₹10,800 per MT
8,001 to 10,000 MT ₹10,200 per MT
10,001 to 20,000 MT ₹5,100 per MT

The onion variant of Type-I is costed at exactly these rates, and at the civil rates above in civil construction. Nothing in the capacity bands distinguishes it. What differs is the equipment package below, which is about ten times larger.

Assistance and conditions

Assistance is credit-linked back-ended at 35% in general areas, and since 21 August 2026 total subsidy on any cold storage project is capped at ₹2.00 crore. The component has to be implemented in accordance with NCCD guidelines only, which governs the technical specification, not just the paperwork.

Systems and modernisation

  • Carbon dioxide scrubber, unified control system, conveying or hoist system, doors and automated computerised systems — the ceiling is per type of store, not one figure: up to ₹52.00 lakh per project for Type-I, up to ₹531.00 lakh for Type-I-Onion (whose package also covers a ventilation system, specialised stacking, and hand and battery-operated pallet trucks), and up to ₹198.00 lakh for Type-II.
  • Controlled atmosphere components for a Type-II CA store: up to ₹995.00 lakh per project, with the maximum subsidy for a CA store capped in the annexure at ₹900 lakh including add-ons. The ₹2.00 crore ceiling introduced on 21 August 2026 is lower than that, so it is the one that binds.
  • Material hoist, pallet trucks, dock leveller and doors for dry spices and raisins units: up to ₹33.00 lakh per project.
  • Refrigeration modernisation with unified control system: maximum ₹125.00 lakh, of which ₹5 lakh is for the control system, and not more than ₹3,000 per MT of capacity, assisted at 35% of the actual cost or the ceiling, whichever is lower since 21 August 2026. Scheme No. 02 is titled “Construction/ Expansion/ Modernization of Cold Storages”, so modernisation sits inside the Cold Storage Scheme that the circular revised, and the ₹2.00 crore ceiling on any cold storage project applies. The circular does not say so in terms, so confirm it with the Board before you budget on it.

Modernisation used to carry a higher percentage than building a new store. On our reading it no longer does: Scheme No. 02 covers construction, expansion and modernisation together, and the August 2026 circular revised the scheme without carving modernisation out, so the same 35% applies to both. The circular does not say this in terms, which is why it is recorded here as our reading rather than the Board’s words.

Sources

Mission for Integrated Development of Horticulture (MIDH) — Operational Guidelines, April 2025
Horticulture Division, Department of Agriculture & Farmers Welfare, Ministry of Agriculture & Farmers Welfare, Government of India · Guideline · 01 Apr 2025 · Current
Official original
Statements checked on this page (9)
  • Source verified by our team NHB Scheme No. 02 in Annexure VI is a "Capital Investment subsidy scheme for Construction, Expansion and Modernization of Cold Storages". — Printed p. 67 (PDF page 77), Annexure VI
  • Source verified by our team Under the NHB cold storage scheme, the Board takes up projects with capacity above 5,000 MT and up to 20,000 MT. Capacity up to 5,000 MT is handled under the NHM and HMNEH sub-schemes instead. — Printed p. 67 (PDF page 77), Annexure VI
  • Source verified by our team For Cold Storage Type-I built in civil construction, the rates are ₹9,120 per MT for capacity between 5,001 and 6,500 MT, ₹8,640 per MT between 6,501 and 8,000 MT, ₹8,160 per MT between 8,001 and 10,000 MT, and ₹4,080 per MT between 10,001 and 20,000 MT. — Printed p. 67 (PDF page 77), Annexure VI
  • Source verified by our team For Cold Storage Type-I built in a combination of civil and pre-engineered building construction, the rates are ₹11,400 per MT for capacity between 5,001 and 6,500 MT, ₹10,800 per MT between 6,501 and 8,000 MT, ₹10,200 per MT between 8,001 and 10,000 MT, and ₹5,100 per MT between 10,001 and 20,000 MT. — Printed p. 67 (PDF page 77), Annexure VI
  • Source verified by our team For Cold Storage Type-I-Onion built in a combination of civil and pre-engineered building construction, the rates are ₹11,400 per MT for capacity between 5,001 and 6,500 MT, ₹10,800 per MT between 6,501 and 8,000 MT, ₹10,200 per MT between 8,001 and 10,000 MT, and ₹5,100 per MT between 10,001 and 20,000 MT. — Printed p. 68 (PDF page 78), Annexure VI
  • Source verified by our team Assistance for NHB cold storage projects is credit-linked back-ended assistance at 35% in general areas. The component has to be implemented in accordance with NCCD guidelines only. — Printed p. 67 (PDF page 77), Annexure VI
  • Source verified by our team For a carbon dioxide scrubber, unified control system, material conveying or hoist system, doors, automated computerised system, ventilation system, specialised stacking system, hand pallet truck, battery-operated pallet truck and dock leveller system in a Cold Storage Type-I-Onion unit, the cost is up to a maximum of ₹531.00 lakh per project, with the actual cost derived from the components and quantities chosen as per NCCD guidelines. This ceiling applies to Type-I-Onion units only: the equivalent for a plain Type-I unit is ₹52.00 lakh and for Type-II is ₹198.00 lakh. — Printed p. 68 (PDF page 78), Annexure VI
  • Source verified by our team For a material hoist, hand pallet truck, battery-operated pallet truck, dock leveller system and doors in cold storage units for dry spices and raisins, the cost is up to a maximum of ₹33.00 lakh per project. — Printed p. 70 (PDF page 80), Annexure VI
  • Superseded For technology induction and modernisation of cold storage, refrigeration modernisation with a unified control system carries a maximum of ₹125.00 lakh, of which ₹5 lakh per project is for the unified control system, and not more than ₹3,000 per MT of cold store capacity. Assistance is credit-linked back-ended at 50% of the actual cost or of the ₹125.00 lakh ceiling, whichever is lower. — Printed p. 70 (PDF page 80), Annexure VI
Version history (9)
DateChangeReasonStatus
14 Oct 2026 Updated — Source verified by our team
20 Sep 2026 Bulk approved by owner pending page-by-page review (article corrected 11 Sep 2026 with claims #87 and #90) — Source verified by our team
11 Sep 2026 Corrected two figures that came from claims #87 and #90: the civil-plus-PEB table was missing its ₹5,100 fourth band, and the sentence under it said the onion variant adds that band when plain Type-I has it too. The ₹531.00 lakh equipment ceiling is Type-I-Onion only and is now given per store type. Under review until someone re-reads it. — Under review
08 Sep 2026 Typographic consistency: verbatim quotation now uses the same curly quotes as the rest of the prose. — Source verified by our team
08 Sep 2026 Removed a claim that modernisation carries a higher rate than new build. That was the pre-August 2026 position and contradicted the 35% stated one line above it. — Source verified by our team
07 Sep 2026 Bulk approved by the owner (7 Sep 2026), not a line-by-line review — Source verified by our team
07 Sep 2026 Open questions on cold storage modernisation and land development settled from the sources — Awaiting verification
07 Sep 2026 Rates corrected after the NHB circular of 21 August 2026 — Under review
07 Sep 2026 Created — Awaiting verification
Report an issue

Spotted something outdated or wrong? Tell us what and, if possible, where the correct information is. No account or phone number needed.

Frequently Asked Questions

Projects above 5,000 MT and up to 20,000 MT. NHM promotes cold storage up to 5,000 MT, so the capacity decides which door you are at.

Yes. Since 21 August 2026, total subsidy on any cold storage project is capped at ₹2.00 crore. On a project large enough to reach that ceiling, the 35% rate stops being the binding number.

The guidelines set ₹9,120 per MT for 5,001 to 6,500 MT in civil construction and ₹4,080 per MT for 10,001 to 20,000 MT. A 12,000 MT store is not costed at twice the rate of a 6,000 MT one.

It used to. On our reading it no longer does: Scheme No. 02 covers construction, expansion and modernisation together, and the August 2026 circular revised the scheme without carving modernisation out. The circular does not say so in terms, so confirm it with the Board.