We use Google Analytics to see which pages are read. Nothing is sent unless you accept, and we never send anything you type. What is collected
NHM · state
NHM in Uttar Pradesh
We have not yet verified Uttar Pradesh's own NHM documents. The national framework still applies here, and it is below — with the state's own door, and a way to ask us to read the rest.
Independent educational and assistance platform. Not a government website and not affiliated with or endorsed by NHB, NHM, the Uttar Pradesh government or any authority. Choosing a state does not mean an application is open or that you qualify.
Covered by this platform
In progress
Nothing here confirms how Uttar Pradesh adds to or varies the national norms.
Application window
Not inferred
Shown on a guide or document only when verified. A guideline's existence never means a window is open.
Your personal fit
Not assessed here
Read the conditions on each guide and confirm with the implementing department before you plan on it.
What we know so far
Research on Uttar Pradesh has started. The state department’s own page for the Mission is now registered as a source, but nobody has read it against the national guidelines yet, so nothing on this page describes how Uttar Pradesh itself runs the scheme.
What does apply here: NHM is a national scheme, and the 64 statements we have taken from the MIDH operational guidelines of April 2025 hold in every state — the components the Mission supports, the national cost norms and the general rates of assistance. Those are the guides listed below, and every figure in them names the page it came from.
One thing already worth knowing: the assistance table the department publishes on that page is headed 2015-16, and the state annual work plan linked beside it is for 2017-18. Both are years older than the April 2025 guidelines we hold. We will not guess which governs today, and neither should you — that is precisely what a reviewer has to settle.
What is still missing: the state mission’s current operational guidelines or annual action plan; any circular that opens or closes an application window; the district offices that receive applications; and any component where Uttar Pradesh adds to, or varies, the national norm. Until those are read line by line, this page cannot tell you whether you can apply today, where to apply, or what the state pays over and above the national rate — and we would rather say so than let you assume the national figures are the whole answer.
If you need one of those answers now, ask. We will answer from what has been verified and say plainly when the answer is not in a document we hold.
What Uttar Pradesh publishes
Written from the state's own pages and documents. Not yet reviewed, and not a statement of what the state pays.
The Uttar Pradesh department publishes a page for the Mission, but the assistance table on it is headed 2015-16 and the state work plan beside it is from 2017-18. Both are older than the nat...
Awaiting verification
17 Oct 20263 min read
Which scheme reaches Uttar Pradesh
NHM. The MIDH operational guidelines of April 2025 say the National
Horticulture Mission covers all States and Union Territories except those in the North Eastern
and Himalayan region, and all districts in the States it applies to. Uttar Pradesh is
outside that region, so NHM is the sub-scheme an application here sits under, and the national
cost norms in the guides below are the ones to work from.
On the NHB side, the Board's circular of 21 August 2026 sets its rate of
assistance at
35% in general areas and 45% in the North Eastern and Himalayan States, Scheduled Areas and
four named Union Territories. Uttar Pradesh is a general area, so 35% is the rate to plan
against — though a Scheduled Area within the state may not be.
The rules quoted here are the national ones. Which states sit inside the North Eastern and
Himalayan region is our reading of them rather than a list either document prints, so treat it as
our wording and confirm anything you are about to spend money on.
The national framework that applies in Uttar Pradesh
NHM is a national scheme run by the state. These guides explain the national rules; they do not confirm Uttar Pradesh's windows, budgets or variations.
National Horticulture Mission (NHM / MIDH) · Protected cultivationGuide
Everyone quotes 50%. Worked at the 4,000 square metre limit against the April 2025 cost norms, the same rule returns about 50% on a net house, 35% on a naturally ventilated polyhouse and 16%...
We compared four state horticulture pages against the national guidelines. In every case the state's figures came from the April 2014 edition, replaced in April 2025. Treat a state figure as...
Awaiting verification
17 Oct 20265 min read
National Horticulture Mission (NHM / MIDH) · Production of planting materialGuide
A large nursery of 1 to 2 hectares carries a cost norm up to ₹30 lakh per hectare at 40% for the private sector; a small nursery of 0.4 to 1 hectare carries ₹20 lakh per hectare at 50%. Both...
Source verified by our team
17 Oct 20262 min read
National Horticulture Mission (NHM / MIDH) · INM / IPM and plant healthGuide
INM and IPM carry a cost norm of ₹5,000 per hectare at 30%, up to 2 hectares per beneficiary. That 30% is the lowest rate in the scheme. Organic farming has no NHM figure at all; the guideli...
Source verified by our team
17 Oct 20262 min read
National Horticulture Mission (NHM / MIDH) · Horticulture mechanisationGuide
Most machinery under NHM defers to SMAM norms rather than carrying its own figure. The clearest exception is a power tiller up to 8 BHP, costed at ₹1.0 lakh per unit with a maximum of ₹0.40...