Agriculture & horticulture
Events worth the journey, and what to ask when you get there
Exhibitions where the people who build polyhouses, cold stores and pack houses are all in one hall. The dates and the link are the organiser's own; what we add is the cost norm to hold a quote against.
- nothing listed for now
- every one links its organiser
- 3 past editions kept below
These dates are the organiser’s. We link to them rather than restate their terms,
and we do not verify an exhibition the way we verify a scheme document. Confirm the dates and the hall
on the organiser’s own site before you travel.
Nothing is coming up that we have listed yet.
Editions that have already run
Off the list above because they are over. An organiser usually announces the next edition on their own site, and these are where to look for it.
Start with the scheme guides
NHB subsidy guide
Commercial horticulture projects, protected cultivation above one acre, and cold storage from 5,001 MT.
Open
NHM subsidy guide
The scheme that covers most states and union territories, component by component.
Open
NHM by state
What we have verified for your state, and what is still an open question.
Open
Official documents
The guidelines and circulars behind every explanation, with the version we checked.
Open
Glossary
Cost norm, back-ended, credit-linked and the rest, in everyday language.
Open
Ask a question
Private by default. No account, no phone number, answered with the source attached.
Open
The questions people ask us most
Myth versus rule
Does NHM give 50% subsidy?
Rates run from 30% to 50% depending on the component, and every one carries a ceiling.
Read the answer
Start here
What a cost norm actually means
The upper limit used to calculate subsidy, not the price of your project. The single most misread number in the scheme.
Read the answer
Protected cultivation
Polyhouse subsidy under NHM
Area-wise cost norms for both polyhouse types, and the 4,000 square metre ceiling that shapes the project.
Read the answer
Choosing a route
NHB or NHM: which applies?
Project size usually decides. Where an NHM ceiling stops, the NHB route begins.
Read the answer